Skip to content
Close up of freight wagon wheels and bogie on a railway track

Markets · Rail and infrastructure

Know when the track is moving.

Track geometry drifts between inspections, and access windows are short. We are building a node that fixes straight to the rail, measures cant and twist, and flags the stretch that is moving.

In development, proof of concept being agreed

Track, cant, twist, structures

What you get

The answer, and what it is worth.

Every market starts from the question your current data cannot answer. Here is what we tell you, and where the money comes back.

What we tell you

  • Cant and twist, measured on the rail
  • Gradual change between inspections, section by section
  • What passing trains do to the track
  • Which stretch to send the crew to first

Where you save

  • Inspections sent to the track that is moving
  • Fewer emergency repairs
  • Designed to fit faster than sleeper mounted kit
Example signalMixer drive · power and temperature
What the sensor hearsWhat we work out from it

Our interpretation

Batch 14 drifting from your good batches

Match to good batchesDrifting
Stage
Heating, 2 of 3
Seen
Heating 9 minutes slower than your good batches
Next step
Check the cooling supply before the next addition

Where you saveFewer failed batches, and the reason they fail

What we measure

The signals behind the answer.

We pick the signals the job needs and connect the records you already hold. Each capture keeps the full waveform, so short events survive.

Signals measured in rail and infrastructure
SignalWhere it goesWhat it tells you
TiltOn the railCant and cross level: the height difference between the rails
TwistBetween nodes along the trackHow cross level changes over a length of track
VibrationOn the railWhen a train passes, so every reading has context
MovementStructures and embankmentsSettlement and shift around the track

How the answer is built

From raw signal to a decision.

Four steps, run by our models and our engineers. Each one is logged against the asset or batch it belongs to.

  1. 01Fit

    Nodes fix to the rail and work out where they sit relative to each other.

  2. 02Capture

    Tilt and vibration are recorded, with every passing train marked.

  3. 03Trend

    Cant and twist are trended section by section, between inspections.

  4. 04Act

    When a section crosses an agreed threshold, the answer goes to your named contacts with the evidence, and can open a work order.

What arrives

An answer your team can act on.

Every answer says what happened, where, why it matters and what to do next, with its evidence, a confidence level, a named owner and a reply deadline.

The pilot

Scoped first

A bounded engineering proof of concept on a defined stretch, then field trials once the node is approved for track.

Book a site audit

Example answer

What happened
Twist building between km 14.2 and 14.6
Where
Up line, between nodes 41 and 44
Why it matters
Moving over three weeks. Left alone it becomes an emergency repair
What to do next
Inspect that stretch first on the next planned visit
Evidence
Tilt trend by node, passing train records and the section history
Confidence and owner
Medium confidence, rising. Owner: track maintenance lead. Reply due this week

Questions

What rail and infrastructure teams ask first.

Is this on the track today?
Not yet. The rail node is in development, and a proof of concept is being agreed. Talk to us now if you want to be part of the first trials.
Does it replace track inspections?
It tells you where to look first. Inspection rules and maintenance decisions stay with your team.
How is it different from sleeper mounted sensors?
Those work, but they need specialist fitting and survey. Ours is designed to fix straight to the rail and set itself up, so it is quicker to fit.

Next step

Put our sensors on the line that worries you most.

A site audit shows where data is missing today, what it would tell you, and which machine or process to start with.

Book a site audit