Skip to content
The corrugated steel conveyor housing and headframe buildings of a mineral processing plant

Proof

See inside a running mill.

Vibration on the mill shell, read against the mill's own settings, shows how loaded it is. A digital twin shows how the charge moves inside. Operators use both to set speed and fill.

Mining · Grinding mill · Vibration · Digital twin · Running on plants

How it works

Four steps from raw vibration to a decision.

Capture, interpret, optimise, on a machine nobody can see inside.

  1. 01

    Capture

    A node on the mill shell captures the full vibration signal over a whole turn of the mill.

  2. 02

    Detect

    Read against the mill's control settings, the signal shows when the mill is heading for overload or running light.

  3. 03

    Interpret

    A digital twin models how the charge moves inside for that load and speed.

  4. 04

    Decide

    Operators get the evidence to set speed and fill, and to focus liner inspections. Your team makes the change.

What the signal shows

Overloads and low feed, picked out of the vibration.

Client data stays with the client. This example chart shows the pattern.

Example mill load signal over three days A load signal derived from vibration, with four overload spikes above the limit line and one period of low feed on day two. Overload limit Low feed Day 1Day 2Day 3
Example chart. Load worked out from vibration, with every overload window shaded.

Measured

Shell vibration

Captured on the mill through a full turn.

Inferred

How loaded the mill is

Read from the signal against the mill's own settings.

Simulated

How the charge moves

Modelled by the digital twin for that load and speed.

What the site gets

An answer the plant can act on.

A recommendation with its evidence, written in the units the site already reports.

Overloads

Overloads caught early

Each spike shows up in the signal, linked to the feed conditions around it.

Speed and fill

Set with evidence

A view of loading and charge movement to set speed and fill against, tried on the twin first.

Liners

Inspections where they count

The loading picture shows where liner and lifter inspections matter most.

Evidence

Maintenance you can justify

Every action comes with the traces behind it, ready for a review or an insurer.

Field record

Built for the hardest places in mining.

From our own nodes on working plants.

Three applications

Mills, screening decks and cyclones

Shell nodes on grinding mills, nodes potted into screening panels, and nodes on cyclone clusters. Built and run on real plants, in some of the hardest conditions in mining.

Battery life

31,000 captures, one coin cell

In a mining trial, a single coin cell battery sent about 31,000 full waveform captures.

Identity

Every panel knows its place

Each node is tied to its panel and its position on the deck, so wear is tracked panel by panel.

  • Running on grinding mills, screening decks and cyclones
  • Pharma, manufacturing and rail proofs of concept in scoping

Next step

Run the same steps on your process.

Pick the process that costs you most. A paid pilot measures it live and compares the result with a number you already track.

Book a site audit